EPS聚苯板施工步骤
Construction steps of EPS polyphenyl board
EPS聚苯板在建筑施工中的使用是比较普遍的,想要延长它的使用寿命,就需要按照以下步骤正确施工,下面一起来看一下吧!
EPS polyphenyl board is widely used in construction. If you want to extend its service life, you need to follow the following steps to construct correctly. Let's take a look below.
1.根据整个外墙立面的设计尺寸编制EPS聚苯板的排板图,并做好预算,这样可以节约材料,加快施工速度。
1. According to the design dimension of the whole facade of the exterior wall, the layout drawing of EPS polyphenyl board is compiled, and the budget is made, so as to save material and speed up the construction.
2.用电热丝切割器或手用刀锯切割板材,切割时要注意对角线及板厚误差,非标准板按实际需要的尺寸加工,大小垂直。
2. Cutting plate with electric wire cutter or hand knife saw, attention should be paid to diagonal line and thickness error when cutting. Non-standard plate is processed according to the actual size, and its size is vertical.
3.做好粘结砂浆的比例配置,用电动搅拌器搅拌均匀,搅拌时要注意防晒避风,若使用时有过干现象出现,可适当加水再次搅匀使用,但是对于超过时间的配料不要使用,以免影响使用效果。
3. Make a good proportion of bonded mortar, mix evenly with electric mixer, pay attention to sunscreen and shelter from wind when mixing. If dry phenomenon occurs in use, water can be added properly to mix again, but do not use ingredients that exceed the time, so as to avoid affecting the use effect.
上一页  石墨聚苯乙烯特点及应用  
下一页  聚苯板用作保温层
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

网站建设及优化 :保定遨游公司

  • 一键拨号
  • 网上订单
  • 联系我们
  • 本站导航

首页

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3